Construction waste is disposed of at a licensed Materials Recovery Facility which separates reusable waste streams such as hardcore, soil, wood, plasterboard and metal for recycling.
For dense materials containers are available in sizes of 4.6 (6cubic yards) and 15.3 (20 cubic yards) cubic metres. For lighter more bulky materials we offer 9.2 (12 cubic yards) and 26.8 (35 cubic yards) cubic metre containers which provide better value.
Scheduled or as required collections schedules are available. |